Monday, April 27, 2009

Final Stages: Kitchen and bathroom remodel

Ok, after everything that has been done to the house we are on the last two rooms downstairs.  Today I installed all the new cabinets in the kitchen.  Tomorrow I will be going and getting the new laminates to cover them.  And in the ensuing weeks I will be putting in tile floor from the bathroom to the kitchen, shellacing the cabinets, a little bit of wall touch up, and closing up the old 1/2 wall and running all new plumbing to the cabinets, but this is the easy stuff.  All of it I have done similar work as this a million times before; all of it is immediately gratifying; and no one gives me the look of a dog that just heard an unfamiliar sound as when I tell them about closing in the crawlspace/jacking up the house/running new electrical lines/etc etc.

Also in the kitchen there will be installed a front load stackable washer and dryer which will be mounted in between these utility cabinets.

I am sorry to everyone that I love that I haven't gotten to see or talk to in a really long time; and I am sure that all of you are mature enough to understand; and that is why I love you guys so much.  I hope that everyone is doing well.  The madness is almost over.

2 comments:

  1. Hey Kids - How's it coming? And be careful who you call mature. :-)

    ReplyDelete
  2. Let's see the new kitchen!!

    ReplyDelete